484-221 UPPER PLUG BRICK-STUDDED-SE210
Studded upper plug brick for the Super E210 Wood Gun wood gasification boiler. The cast-in studs anchor the brick to the plug so it stays seated under repeated heating and cooling cycles. One is required per boiler. It is part of the complete upper plug assembly and can also be ordered on its own.
Category
Parts & Options
Shipping Weight
8lbs